%0 Article %T Time studies on stone work done in forest drainage %A Yli-Vakkuri, Paavo %D 1954 %J Silva Fennica %V %N 84 %R doi:10.14214/sf.a9105 %U https://silvafennica.fi/article/4643 %X

When ditches are dug in forest drainage, smaller stones are removed by hand, but the larger ones require the use of explosives or stone lifting machinery. Use of explosives have been a more common method for the larger stones. Due to development of detonation methods, it has also been used for smaller stones than earlier.

The investigation was a time study comparing five different stone lifting machines. Time needed for different stages of the work was measured. The stages lasted approximately as long for all of the machines. However, the effectivity of the machines could not be determined, because the stones removed were not similar enough. Stone lifting machine Pekka appeared slightly more effective than the other four machines. It was also easy to assemble, disassemble and move.

The article includes a summary in German.