article id 5349,
category
Article
Raphael E. L. Ole-Meiludie,
Goodseldah K. Pamba.
(1988).
Time study on different techniques for nursery pot filling operation.
Silva Fennica
vol.
22
no.
2
article id 5349.
https://doi.org/10.14214/sf.a15506
Abstract |
View details
|
Full text in PDF |
Author Info
Time study on different techniques in nursery pot filling operations at SUA Training Forest in Northern Tanzania was conducted. The results showed that improved tools and work place design significantly decreased the operation time, hence increased productivity. In addition, worker’s comfort was generally increased.
The PDF includes a summary in Finnish.
-
Ole-Meiludie,
E-mail:
ro@mm.unknown
-
Pamba,
E-mail:
gp@mm.unknown