Current issue: 58(5)
For sawmills, paper mills, particleboard, oriented strand board (OSB), fiberboard and other wood production factories, the log yard is the first step, where raw materials are sorted and stored before production begins. Due to the size of these production sites great potential exists for the optimisation of internal logistics. In this paper the different planning problems of the log yard are introduced and existing literature examined. Beginning with the tactical problems of structure, such as assessing material flow, planning facility layout and assigning storage areas, it continues with operational problems such as vehicle movement planning within the log yard, empty trip minimisation and the seasonality of raw material availability. Data derived from this study reveals a variety of possible solution methods, the applicability of which depends on the precise nature of the log yard operations. Additionally, several real life examples are provided which illustrate the potential for operational improvement.