Current issue: 58(1)

Under compilation: 58(2)

Scopus CiteScore 2021: 2.8
Scopus ranking of open access forestry journals: 8th
PlanS compliant
Silva Fennica 1926-1997
1990-1997
1980-1989
1970-1979
1960-1969
Acta Forestalia Fennica
1953-1968
1933-1952
1913-1932

Articles containing the keyword 'two-stage sampling'

Category : Article

article id 5615, category Article
Andrew P. Robinson, Timothy G. Gregoire, Harry T. Valentine. (1997). Cut-off importance sampling of bole volume. Silva Fennica vol. 31 no. 2 article id 5615. https://doi.org/10.14214/sf.a8516
Keywords: Monte Carlo methods; forest mensuration; mean-square error; two-stage sampling
Abstract | View details | Full text in PDF | Author Info

Cut-off importance sampling (CIS) is introduced as a means of sampling individual trees for the purpose of estimating bole volume. The novel feature of this variant of importance sampling is the establishment on the bole of a cut-off height, HC, above which sampling is precluded. An estimator of bole volume between predetermined heights HL and HU > HC is proposed, and its design-based bias and mean square error are derived. In an application of CIS as the second stage of a two-stage sample to estimate aggregate bole volume, the gain in precision realized from CIS more than offset its bias when compared to the precision of importance sampling when HC = HU.

  • Robinson, E-mail: ar@mm.unknown (email)
  • Gregoire, E-mail: tg@mm.unknown
  • Valentine, E-mail: hv@mm.unknown

Register
Click this link to register to Silva Fennica.
Log in
If you are a registered user, log in to save your selected articles for later access.
Contents alert
Sign up to receive alerts of new content
Your selected articles