Current issue: 58(4)

Under compilation: 58(5)

Scopus CiteScore 2023: 3.5
Scopus ranking of open access forestry journals: 17th
PlanS compliant
Select issue
Silva Fennica 1926-1997
1990-1997
1980-1989
1970-1979
1960-1969
Acta Forestalia Fennica
1953-1968
1933-1952
1913-1932

Articles containing the keyword 'boom-tip control'

Category : Research article

article id 10161, category Research article
Jussi Manner, Anders Mörk, Martin Englund. (2019). Comparing forwarder boom-control systems based on an automatically recorded follow-up dataset. Silva Fennica vol. 53 no. 2 article id 10161. https://doi.org/10.14214/sf.10161
Keywords: automation; cut-to-length logging; haulage; crane work; extraction; boom-tip control
Highlights: Boom-tip control saves time compared to the conventional system; This study introduced a field-study design enabling establishment of causal relationships during ordinary forwarding operations; Although the study design requires some extra arrangements, it efficiently combines the representativeness of conventional follow-up datasets with establishment of causal relationships that traditionally have been possible only through observational time studies or standardized experiments.
Abstract | Full text in HTML | Full text in PDF | Author Info

Crane work is the most time-consuming work element in forwarding. Hence, assist systems like boom-tip control are of interest. The first commercially available boom-tip control for forwarders was introduced in 2013. In this study we analysed whether replacing conventional boom control (CBC) with John Deere’s version of boom-tip control (named Intelligent Boom Control, IBC), increases crane-work productivity. We used data automatically gathered from 10 final-felling stands, covering typical logging conditions for southern, central and northern Sweden. Two John Deere 1510E and two John Deere 1910G forwarders were operated by seven experienced operators during the follow-up study, covering 1238 loads in total. A split-plot design was applied to isolate effects of the boom-control system being used (CBC, IBC). We found that using IBC for loading work (crane work and driving included) saved 5.2% of productive machine time compared to using CBC (p ≤ 0.05). The corresponding saving when using IBC for unloading work was 7.9% (p ≤ 0.05). Depending on geophysical factors, this corresponds to approximately 4% savings in productive machine time for forwarding as a whole, including pure transport (with and without load). Moreover, the study introduced in cut-to-length context a novel field-study design to collect a large follow-up dataset in the course of ordinary forwarding operations. We found the study design to be a cost-efficient way to combine the representativeness of conventional follow-up datasets with the ability to establish causal relationships. Establishment of causal relationships has traditionally been possible only through observational time studies or standardized experiments.

  • Manner, The Forestry Research Institute of Sweden (Skogforsk), Uppsala Science Park, SE-751 83 Uppsala, Sweden ORCID http://orcid.org/0000-0002-4982-3855 E-mail: jussi.manner@skogforsk.se (email)
  • Mörk, The Forestry Research Institute of Sweden (Skogforsk), Uppsala Science Park, SE-751 83 Uppsala, Sweden E-mail: anders.mork@skogforsk.se
  • Englund, The Forestry Research Institute of Sweden (Skogforsk), Uppsala Science Park, SE-751 83 Uppsala, Sweden E-mail: martin.englund@skogforsk.se

Register
Click this link to register to Silva Fennica.
Log in
If you are a registered user, log in to save your selected articles for later access.
Contents alert
Sign up to receive alerts of new content
Your selected articles