Current issue: 58(5)
As a subproblem in the joint Nordic Terrain-Machine Project the requirements set by forest road construction on the terrain classifications were studied during the summer 1973 in ten operations, in which either a bulldozer or an excavator method was used.
The most important terrain factors of the ground factors affecting the construction time of the road base were the so-called depth index and the moisture content of the soil, and in addition to these the amount of stumps as a ground roughness factor. These variables explained, however, only a rather minor part of the wide variation in the construction output of the practical operations.
The PDF includes a summary in English.