The physical strain put on forest workers and work time consumption during pulpwood cutting were compared when the bolts were stacked at the side of strip road, the strip road spacings being 15–25 m and 26–35 m, and when stacked at scattered points along the cutting strip.
When stacking at scattered points along cutting strip work time consumption was 17–21% and the heart rate 9–12% less than when stacking at the side of the strip road, strip road spacing being 15–25 m. When the strip road spacing was increased to 26–35 m, the time consumption increased by 18–30%, but the heart rate appeared unchanged. This result suggests that the forest worker compensates for increased physical strain caused by an increased stacking distance by changing his working technique and rate and by increasing the number of his breaks.
The PDF includes a summary in English.
As a subproblem in the joint Nordic Terrain-Machine Project the requirements set by forest road construction on the terrain classifications were studied during the summer 1973 in ten operations, in which either a bulldozer or an excavator method was used.
The most important terrain factors of the ground factors affecting the construction time of the road base were the so-called depth index and the moisture content of the soil, and in addition to these the amount of stumps as a ground roughness factor. These variables explained, however, only a rather minor part of the wide variation in the construction output of the practical operations.
The PDF includes a summary in English.
The problem considered in this paper is how to analyse the usefulness of some average volume values of stems in predicting the average time consumption of some processors. In this connection, the usual arithmetic mean, the arithmetic mean weighted with volume and the geometric mean were used. The functions describing the dependence of time consumption per tree on the volume of the tree were obtained from previous studies, as were the stand properties.
The results were obtained with the aid of computer simulation techniques and the deterministic model described above. According to the results, the usual arithmetic mean is very applicable for predicting the time consumption. The geometric mean is nearly as good, or in some cases even better. However, as a rule its computation is much more tedious than that of the arithmetic average volume for the purpose.
The PDF includes a summary in English.
The paper deals with the concepts of time consumption and output in forest work science. When output is defined as the inverse of time consumption and vice versa, it is possible to show the important consequences in probability functions. For instance, it is not the same if the dependent variable in a regression analysis is output or time consumption. Also, the average differ depending on if they are based on the time consumption figures or on the average output.
The PDF includes a summary in English.